Grand Cayman Airport Expansion December 2020

The MWCR Airfield Upgrade Project works commenced in early November 2019 and consisted of six sub-projects, including the rehabilitation of the existing runway surface to increase its strength and durability, a runway extension, a new parallel taxiway, the filling of the ponds within the airfield perimeter, establishing an airfield perimeter road and expanding the aircraft parking ramp in an easterly direction to provide additional aircraft parking.
Back to Top