MEVA supplied the complete formwork for the two “Roche Towers“ in Basel
The following MEVA formwork systems were used:
- Automatic climbing system MAC
- Screen system MGS-H
- Slab formwork MevaDec
- Wall formwork Mammut 350 in combination with the support frame STB 450
_______________ MEVA systems in use ________________________
0:00 Intro
0:19 Start of construction Roche Tower 2
1:50 Offer period with BIM models
2:18 Assembly MAC and MGS-H in the building core
2:33 MAC und MGS-H in use
3:52 Proof and concreting
4:13 MGS-H in detail
4:48 Now it’s time to climb
5:38 Floor slabs
7:04 Completion of shell and installations
7:48 Dismantling and remodeling climbing systems MAC and MGS-H
9:10 Completion