The treatment is effective in the top layers typically up to 6m depth, though improvements up to 10m have been seen in some conditions. A drop weight of 5 to 12 tonnes (depending on size) is dropped onto a special foot assembly 30-80 times a minute. The foot remains in contact with the ground at all times.
Rapid Impact Compaction can solve the problem of the reverse side of the bridge abutment, the side of the tunnel, the surrounding of the bridge pile, the slope, the surrounding of the bridge pile, the side slope, the turning area of the compaction machine turning machine, the no road area, etc. Problems such as early rise of road damage, bridge abutment jumping, bridge pile inclination, and side slope rolling after the settlement of key equipment
Website:
Quoted Price Email : ricmadeinchina@