How To Make $20 Million Energy Turbines. Large Electrical Generator Building Process

How To Make $20 Million Energy Turbines. Large Electrical Generator Building Process 0:13. Steam turbine rotor shaft forging process 1:53. Steam turbine rotor shaft machining process 3:24. Turbine blade manufacturing 08:01. Bladed disk manufacturing 10:41. Turbine laser alignment 12:38. Manufacturing process of steam turbines 15:21. Assembly of 270 MW steam turbine 17:34. Large Electrical Generator Building Process 20:44. The Siemens SGT-800 gas turbine 24:05. How the CFM56 engines are assembled 25:07. High voltage coil insulation system 28:28. How does a CFM56-5B work ------------------------------------ Credit: Kennametal Inc. Doosan Škoda Power Doosan heavy industries CFM International TVF, . televizní a reklamní spol. Pechova 26, 615 00 Brno tel.: 548 226 056, 602 511 994, tvf@ EKOL Group Siemens Group - Martin Stiegler PRUFTECHNIK Autodesk Advanced Manufacturing C*Blade .- Turbine Blades Hilco Bid Houghton International -------------------------------------- ⚠️ Copyright Disclaimers • We use images and content by the YouTube Fair Use copyright guidelines • Section 107 of the U.S. Copyright Act states: “Notwithstanding the provisions of sections 106 and 106A, the fair use of a copyrighted work, including such use by reproduction in copies or phonorecords or by any other means specified by that section, for purposes such as criticism, comment, news reporting, teaching (including multiple copies for classroom use), scholarship, or research, is not an infringement of copyright.” • This video could contain certain copyrighted video clips, pictures, or photographs that were not specifically authorized to be used by the copyright holder(s), but which we believe in good faith are protected by federal law and the fair use doctrine for one or more of the reasons noted above.
Back to Top