During the Open House event, held in Cesena from 19 to 20 may 2017, a few equipment have performed some tests in our dedicated test field area.
In this video, the SR-45 in CFA version using an assembly and disassembly tool, useful to mount and unmount the augers very quickly and primarily with no need for an operator to climb up and insert the pins into the joint.
Lower costs and greater safety.
_______________________________________________
Soilmec equipment is used everyday on jobsites all around the world for bridges, viaducts, motorways, tunnels, underground lines, railways and buildings of all types.
We have grown enormously over these four decades. Thanks to a constantly upgraded and broadening range of products and a greatly increased production capability, we are an established landmark in the international ground engineering field.
The company was established in 1969. Since its inception, Soilmec has always developed safe, innovative, cutting-edge technologies and provided the