New Common Dome Sleeved, Presumably for Booster 5 | SpaceX Boca Chica

As crews continue to repair Ship 20’s thermal protection tiles, a new Common Dome, presumed for Booster 5, is sleeved at the Production Site. Meanwhile, GSE Tank 7 is installed at the Orbital Launch Site. Video & Photos from Mary (@BocaChicaGal) and Nic (@NicAnsuini). Edited by Nathan Shields All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF. Click “Join“ for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel. Rolling Updates and Discussion: Articles: NSF Store: L2 Boca Chica (more clips and photos) from BC’s very early days to today. (Join L2 and support NSF here: ) 0:00 - Sunrise Over Boca Chica 0:
Back to Top