The construction process of drilling holes and installing pipelines through the road

The basic principle of road drilling is to reserve holes on the ground by vibrating the drill bit, and then use the pipeline laying tool to smoothly bury the pipeline in the hole. This can not only avoid damage to the road, but also ensure the efficiency and quality of pipeline construction.
Back to Top