Unissued / unused material - dates and locations may be unclear / unknown.
Ruhr, Germany
Various good shots, the Krupps steelworks where molten steel is being poured into a container which will take the liquid iron to its destination. Various shots, a large transporter container or “torpedo truck“, 34 metres long, (effectively a boiler with 50 cm thick walls) carrying the hot liquid iron at 1400 degrees Celsius along the motorway from Rheinhausen to a foundry in Bechum. MS Steam engine passes camera. CU Driver looking out of window. CU Wheels turning. LS Container leaving steelworks on train. CU Managers watching. MS Container being filled with liquid iron. CU Workers watching. Excellent shot of molten steel or iron being poured into a mould at steelworks.
Note: Date on original record: 08/03/1968.
FILM ID:
A VIDEO FROM BRITISH PATHÉ. EXPLORE OUR ONLINE CHANNEL, BRITISH PATHÉ TV. IT’S FULL OF GREAT DOCUMENTARIES, FASCINATING INTERVIEWS, AND CLASSIC MOVIES.
FOR
1 view
0
0
10 years ago 00:06:42 1
Septekh - Superheated Liquid Iron Core
9 years ago 00:08:56 9
Burning Iron in Liquid Oxygen - Periodic Table of Videos
4 years ago 00:00:58 1
Liquid Iron Transported AKA Liquid Iron (1968)
9 years ago 00:12:41 53
US IRON CLUB LIQUID CHALK - Will This Make Me Strong?!
7 years ago 00:00:29 18
NANOMAX LIQUID IRON 250 руб.
9 months ago 00:05:28 2
Power Supply - Liquid Weed
9 months ago 00:07:20 8
Power Supply - Iron Weed
5 years ago 00:19:31 1
Kevin Talks Irons #8: Liquid fuel irons
11 years ago 00:05:34 8.5K
Super Hydrophobic Surface and Magnetic Liquid - The Slow Mo Guys