Construction of the Largest Wind Farm in Southeast Asia

150MW BURGOS WIND FARM EDC Wind Power Corporation A timelapse documentation prepared for Energy Development Corporation (EDC). However, this presentation represents the author’s own edit. It is not the approved version of EDC. Featuring 50 units of Vestas V90 3MW wind turbines. Commissioned last November 5, 2014. The estimated cost for the construction of the wind farm was US$450 million. Coverage commenced from the arrival of turbine components last October 2013, with the blades, nacelles and tower seg