Kölner Dom - Demontage des 2. Hängegerüst - Cologne Cathedral Scaffolding - Part 2 Finale

English/Deutsch. In part 2 you can see the remove of the big hanging scaffold in sextuple speed, accompanied by music of Goldman Cologne. Title: Les Fade - Album: On The Outside (Looking In) Stefan Krachten: drums & Dirk Herweg: key./git. Only the very best for the Cologne remove a 33 meter high and 25 tonnes heavy suspended aluminum scaffold in three parts from the north tower, a brand-new and second largest mobile crane of the world from Liebherr is called into action -- the LTM 1750-9.1. The 750 tonnes (loading capacity) gigacrane was assembled on July 21, 2013 beginning on Sunday morning at 10a.m., with a little break, until Monday morning, July 22, 2013, at 5a.m. in perfect teamwork by the Wasel company from Cologne/Bergheim. For the supports of the crane, foundations had to be cast into the station’s forecourt. Operating weight of the mobile crane: 108 tonnes -- complete ballast (counter weight) 204 tonnes. The biggest mobile crane worldwide -- the LTM 11200 -- also built b
Back to Top