Coming up on 1 year since this project I figured I would make a 10 minute build video since I wanted to do it before and never did. I sold the car last year thinking I was moving far away and couldn’t keep the car. I hope the new owner is happy with it and loves it as much as I did.
#2geclipse #gsx #savetheeclipse
You can see more of the build on my “Eclipse GSX Build“ Playlist on my Channel.
EVERYTHING I BOUGHT & PUT INTO THE CAR (NOT including parts that were on shell) :
-------------------------------------------------------------------------
- Full Paintjob
- 7 Bolt 4G63T
- Manual Trans
- Transfer Case
- 7 Bolt Engine Harness
- Axle Half Shaft
- Evo 16G Turbo
- Fp Manifold
- Eprom ECU
- Evo Brembo Brakes
- Stoptech posi quiet pads
- Walbro 255 Fuel Pump
- Fuel Lab Filter & Pressure Regulator
- Fuel Lab 6AN line
- ABS Delete (steel braided lines)
- New turbo Oil feed (steel braided)
- New Master cylinder
- New slave cylinder
- New clutch line (steel braided)
- New Starter
- New Starter Plate
- New Va
24 views
484
129
2 days ago 00:36:09 1
Why Fun Projects Are the Key to Saving This Building