The Phnom Penh-Bavet Expressway is planned to cost a total investment of $

The Royal Government of Cambodia has urged the company to build the Phnom Penh-Bavet Expressway worth 1638 million dollars in accordance with technical standards and complete the deadline. Note: Construction of a new expressway that will connect Phnom Penh with Vietnam began construction on June 7, 2023. The Phnom Penh-Bavet Expressway is the second expressway in Cambodia after the Phnom Penh-Sihanoukville Expressway, which was officially launched in 2022. In addition to the groundbreaking ceremony for the Phnom Penh-Bavet Expressway, the Mekong River Bridge and Intersection Bridge will also be inaugurated. The Phnom Penh-Bavet Expressway has a total length of km from Thmor Kor Commune, Lvea Em District, Kandal Province to Chrakmtes Commune. Bavet City, Svay Rieng Province. This road is 4.1 km long, passing through Kandal province 70.9 km long, Prey Veng and Svay Rieng 60.1 km long. This project will carry out the following construction technical work: AC concrete 10 cm thickness and ATB concrete 12 cm wide, 24.5 meters wide, 4 roads for traffic. Each road is meters wide, the park divides traffic in the middle, the road is 3 meters wide, the concrete road is 2.5 meters wide and the red gravel sidewalk is meters wide on each side. Construction of 26 main and medium bridges with a total length of 2,266 meters, 16 small bridges with a total length of 256 meters and 197 types of drainage. Construction of 5 lanes, 204 large and small tunnels. Build 2 service areas, 1 parking lot, 3 maintenance centers and 6 payment points. Equipped with road equipment including traffic signs, traffic lights, main road signs and safety barriers in accordance with the technical standards of the expressway. This expressway allows all types of vehicles to drive at speeds of up to 100 and 120 kilometers per hour. The project will include the construction of cross-border infrastructure, with the Royal Government in charge of purchasing land for the site and the construction of cross-border infrastructure. Along with the construction of the Phnom Penh-Bavet Expressway, the Royal Government also decided to build a bridge across the Mekong River, which connects Dei Edth Commune, Kien Svay District (from Ring Road 3) to Thmor Kor Commune, Lvea Em District and connects to the Phnom Penh-Bavet Expressway. Bavet. This bridge is a 1600 meters long, 26 meters wide concrete bridge and a 2100 meters long, 26 meters wide connecting road on both sides, one junction and two lower roads. The Phnom Penh-Bavet Expressway is planned to cost a total investment of 1638 million US dollars.
Back to Top