Construction in Winter: Continuing the Building of a Bath for Narges and Her Young Children

In this continuation of the video, Nargess, Rasoul, and the mute architect are busy constructing the walls of the bathroom. Rasoul goes up to the roof of the house to pour water over the concrete that has dried to make it firmer and fill any cracks. Meanwhile, the architect is preparing concrete using sand and cement, and Nargess is engaged in cleaning the house and its surroundings. After a while, Rasoul and the architect start building the bathroom walls. Nargess informs Rasoul that Mr. Filmmaker has bought some groceries for them, and she plans to prepare lunch with them. When the children wake up from their nap, Nargess becomes distressed as she needs to take care of them, cook, and help with building the bathroom simultaneously. After the children fall asleep again, Nargess begins washing the dishes and clothes, and after a while, lunch is ready, which they enjoy together with Rasoul, the architect, and their two children. These activities reflect their cooperation and camaraderie wi
Back to Top